Sandy Cove Option 1a update Posted on October 27, 2022 at 4:22 pm. Click to enlarge plan Option 1a is where NPHC have their own breakwater on the back of the outside quay. It allows additional mooring on the inside and on both sides of the main quay. Note that the engineering consultants WSP Ltd are only engaged to look at construction options of the quays, breakwater and the land reclamation, not the buildings.