Notice to Mariners – Wave Hub Offshore during July 2013 Posted on June 28, 2013 at 12:00 am. Mariners are advised that the following survey works will be carried out at the Wave Hub offshore site and along the charted Wave Hub export cable route from approximately 2nd July until 20th July: Sediment sampling and video survey within the following coordinates at the northern end of the Wave Hub site: 50 22.3’ N 5 37.4’W 50 22.8’N 5 37.6’W 50 23.0’N 5 36.1’W 50 22.5’N 5 36.0’W Bathymetry and depth of burial survey of the charted export cable route between the Wave Hub (50 20.8’N 5 37.2’W) and the landfall off Harveys Towans, Hayle. ROV visual inspection of the Wave Hub and cable components within the 500m Safety Zone centred on 50 20.8’N 5 37.2’W The survey vessel may be restricted in her ability to manoeuvre when towing survey equipment or operating with an ROV. Survey Vessel details: MV Flatholm VHF Channel 16 Mobile Tel: 07702 16900 Sat: +88 1631 448341